As is typical to WA, the College’s location is predominantly flat, with sandy soils. In general, this type of environment poses a high risk for termite attack that is common to this region.
The main challenge with the installation came from the rammed earth exterior walls. The composition of these walls can chip easily, so nailing or sealing the termite barrier into place was not practical. The solution was to install Termimesh cold joint / paver trays to the perimeter of the concrete slab edge. This protected the concealed entry points between the slab and the wall. They also engaged into the external pavement instead of against the rammed earth wall itself