Working closely with the Built Environs team, supplied architectural plans were precisely marked up to identify all areas requiring protection from concealed termite entry, with an accurate assessment of the quantity surveying requirements of Termimesh, Termiflanges and Termiparge being provided by our estimating team.
Early engagement and ongoing communication with the Built Environs team throughout the tender and delivery phases supported the successful execution of the works and strengthened the rapport between both parties throughout the project.
In total, certified Termimesh technicians installed over 800 lineal metres of TMA725 stainless steel termite barrier mesh to all perimeters, cold joints and construction joints. To prevent termite ingress through expansion gaps arising from singular and clustered electrical and hydraulic penetrations, 335 Termiflange termite mesh collars were cut, secured and embedded across the concrete ground slab.
The creation of several blockouts following the removal of the tower crane bases across the site raised concerns for Built Environs, in that these areas may be overlooked for termite management. Prior to backfilling, the Termimesh System was installed in these areas to ensure continuity across the project.